April 2019: Aerial View of the Construction

The construction work of the Cathedral of Our Lady of Arabia is continuing. The design and floor plan are clearly evident in the aerial photographs below. One can see the Altar and the two Side Chapels taking shape and in the centre — the entrance and staircase to go to the Crypt in the lower level of the Cathedral.

This entry was posted in All. Bookmark the permalink.

Comments are closed.